|
Completion date of the building – December 2008;
Payment plan: 10% deposit
40% upon signing of Preliminary contract
Level of completion: • A lift; • Gasification; • PVC window frames; • Height of the ground floor – 3,20 m; - 2 offices – possibility for changing the state. • Height of the floors – 2,77 m; • Common parts – tiled, painted, railings, decoration. • Insulation – hydro- and thermo-; • Roof construction – slate, tiled.
|